Industrial control panels: building, wiring and testing
Automation and power panels, including large and complex ones, built and wired in-house with order and build quality.
BThe service
The control panel is the heart of the system, and one of our specialities. In our workshop in Curtatone, near Mantua, Italy, Simetec builds and wires industrial automation, control and power panels: from machine-mounted panels to multi-section line panels with hundreds of I/O points, safety PLCs, drives and industrial networks. Every panel gets the same standard of order, because safety, maintainability and service life depend on it.

Large, complex panels without losing order
The bigger the panel, the more order becomes a technical matter. In multi-section enclosures we lay out components by function (power, drives, control, safety, signals), separate power and signal routes, size ducts and ventilation and leave spare space. The result is a panel that stays readable even with hundreds of conductors.
Build quality you can see
Wires labelled and ferruled at both ends, tidy numbered terminal blocks, carefully tied network cabling, correctly bonded shields: a well-wired panel is recognisable at a glance. This order is not cosmetic; it makes the panel inspectable, safe and easy to modify over the years.
Tested before delivery
Every panel is checked in the workshop before shipping: wiring verified against the diagram, insulation and continuity tests, and functional checks with the PLC software where applicable. The panel reaches the machine ready for start-up, shortening commissioning.
Designed and wired by the same team
The wireman works closely with the designer and the programmer. Issues are solved in the workshop, not on site, and the as-built diagram reflects exactly what was built.






CHow we work
How we work.
- 01
Procurement
We purchase components according to the project bill of materials.
- 02
Assembly
Drilling, mounting of rails, ducts and devices.
- 03
Wiring
Power and auxiliary wiring with labelled, ferruled conductors.
- 04
Testing
Electrical and functional checks, documentation update.
DWhy Simetec
Entirely in-house.
- 01
Entirely in-house
Design, software, panels and testing at the same site, with no outsourcing.
- 02
Remote assistance on every machine
Remote diagnosis in record time: simpler issues are solved without a site visit.
- 03
Technicians across Italy
When needed, one of our technicians works directly on the plant, anywhere in Italy.
EFrequently asked questions
Frequently asked questions
Do you build large control panels?
Yes. We build multi-section line and plant panels with power distribution, drives, PLCs and distributed I/O, as well as more compact machine-mounted panels.
Do you wire panels from client-supplied diagrams?
Yes. We build panels from our own designs or from client diagrams, flagging any issues before construction.
Is the panel tested before delivery?
Always. Every panel is electrically verified and, where applicable, tested with the software before shipping.
→Contact
A plant to design, upgrade or bring back to life?
Tell us about the problem. We reply with a technical assessment, not a generic quote.